Projects
- All
- Civil
- Construction management
- Hydraulics

Dickson Interchange Stage 1 & 2
Dickson Interchange Stage 1 & 2
Work Type
Civil Construction management HydraulicsClient
DomaDescription of work
D Group conducted the bulk earthworks for the construction of the DKSN interchange project. The exported material was classified as contaminated due to the presence of heavy metals, which required strict logistics management and extensive stakeholder engagement with neighbouring governmental bodies including Environmental Standards and Worksafe.
Value: $8 million
Duration: 34 Months
Status: Completed

Firing Range Upgrade
Firing Range Upgrade
Work Type
Civil Construction management HydraulicsLocation
CanberraClient
Sporting Shooters Association of Australia ( SSAA)Description of work
The project involved 230,00m3 of material import including civil works, upgrading the firing range stop butt mounds and improving site access to existing firing ranges. Extensive environmental management was required to ensure all contaminants associated with leachate development were encapsulated on site. Continued consulatation with ACT Parks agronomists enabled the management of native grasslands and significant tress.
Value: $3.6 million
Duration: 18 Months
Status: Completed

Circuit Mark Webber
Circuit Mark Webber
Work Type
Civil Construction management HydraulicsLocation
Pialligo ACTClient
Circuit Mark WebberDescription of work
D group facilitied the deisgn and upgrade of the Circuit Mark Webber International Kart Track. Site infrastructure including access road and stormwater drainage were upgraded, along with the construction of the new circuit. Works will continue with the track for stage 2.
Value: $4 million
Duration: 20 Months
Status: Completed

University of Canberra Training Hospital
Work Type
Civil HydraulicsLocation
Bruce, ACTClient
MuliplexDescription of work
D Group conducted the bulk earthworks for the construction of the University of Canberra Training Hospital, inclusive of detail excavation, inground hydraulics, foundation of works, slab on groun and landscaping. Roadworks were constructed enabling the permanent access of the site from a major arterial road.
Value: $11.5 million
Duration: 7 months
Status: Completed

Verve Apartments
Work Type
CivilLocation
Newcastle, NSWClient
BlocDescription of work
The project consists of construction of 211 residential apartments, over 19 levels with 1 level basement car parking and 3 levels of above ground car parking. Works consisted of: sewer drainage, stormwater drainage, trade waste drainage, siphonic drainage, sanitary stack work, cold water services, hot water services and gas services.
Value: $3.6 million
Duration: 18 months
Status: Compelted

Park Avenue Apartments
Park Avenue Apartments
Work Type
CivilLocation
Canberra, ACTClient
Morris Property GroupDescription of work
The Park Avenue Apartments consists of construction of 184 residential apartments from level 4 - 17. This included 3 levels of basement car parking, 4 levels of above ground parking and tenancy provisions. Works consisted of: sewer drainage, stormwater drainage, trade waste drainage, siphonic drainage, sanitary stackwork, hot water services, cold water servoces, gas services and fire services.
Value: $2.7 million
Duration: 18 Months
Status: In construction (April 202)

Palko Apartments
Work Type
HydraulicsLocation
Braddon, ACTClient
BlocDescription of work
The project consists of construction of 84 units of 6 levels, including two levels of car parks and 21 tenancies located on the ground floor. Work consisted of: sewer drainage, stormwater drainage, trade waste drainage, sanitary stack work, cold water services, hot water services, gas services and fire services.
Value: $1.97 million
Duration: 18 Months
Status: Completed

Goodwin Farrer Stage Two
Work Type
HydraulicsLocation
Farrer, ACTClient
PBSDescription of work
Multi residential/commercial. This project consists of the construction of an aged care facility over three buildings. Building D consisted of 24 apartments with basement car parking, Building E (RACF) consisted of 81 disabled compliant ensuites with support services for staff including doctor and nurses, a commercial kitchen, basement car parking and an office space. Building F consisted of 46 apartments with basement car parking. Work consisted of sewer drainage, stormwater drainage, trade waste drainage, sanitary stack work, cold water services, hot water services, gas services and fire services.
Value: $4 million
Duration: 24 Months
Status: Completed

The Capitol Apartments
Work Type
CivilLocation
Civic, ACTClient
BlocDescription of work
This project consisted of bulk excavation of a 4 story basement in Canberra City.

Sapphire Apartments
Work Type
HydraulicsLocation
Kingston, ACTClient
BlocDescription of work
This project consisted of the construction of 79 car parks, sewer drainage, storm water drainage, santiary stack work, hot water services, cold water services, gas services and fire services.
Value: $2 Million
Duration: 12 Months
Status: Completed

109 Canberra Avenue Apartments
Work Type
Civil HydraulicsLocation
Griffith ActClient
BlocDescription of work
This project consisted of bulk and detailed excavation, civil works and hydraulics package.

The Republic Development
Work Type
Civil HydraulicsLocation
Belconnen, ACTClient
GeoconDescription of work
The Republic Development included three towers delivered in stages which form part of Canberra's largest mix used development in history. With over 1000 units, a 188 room hotel and a commercial & retail spaces throughout. Excavation was undertaken across three stages totalling 22 000m3 in volume. This development is one of Canberra's largest projects in terms of civil and earthwords.
Value: $15.5 million
Duration: 26 months
Status: Completed

Marymead Developments
Work Type
HydraulicsLocation
Narrabundah, ACTClient
Project CoordinationDescription of work
This project consists of 84 townhouses, an administration building and a community centre. Works consisted of: sewer drainage, stormwater drainage, trade waste drainage, sanitary stack work, cold water services, hot water services, gas services and fire.
Value: $3.1 million
Duration: 18 Months
Status: Completed

Little National Hotel
Work Type
HydraulicsLocation
Barton, ACTClient
DomaDescription of work
This project consisted of bulk and detail excavation, hydraulics package.

Autoworld Gungahlin
Work Type
Civil Construction management HydraulicsLocation
Gungahlin, ACTClient
Gungahlin Auto Group/Waves Car WashDescription of work
This project cosisted of the complete design and purpose built construction.

Linq Apartments
Work Type
Civil HydraulicsLocation
Belconnen, ACTClient
Creative BuildingDescription of work
This project consisted of bulk excavation, detailed excavation, external civil works, hydraulics package and pavements.

The Apartments
Work Type
Civil HydraulicsLocation
New Acton ACTClient
Molonglo Group & PBSDescription of work
Bulk excavation, detail excavation, bored piers, shotcrete, design and construction of hydraulics package, directional boring sewer diversions and ACTEW sewer, water & storm water external services.

Realm Precinct
Work Type
Civil HydraulicsLocation
Barton ACTClient
Doma GroupDescription of work
This project consisted of bulk civil earthworks and hydraulics works. It included a 160 unit apartment complex, 80 unit apartment complex with ground floor tendancies and 46 service apartments.

Belconnen Community Health Centre
Work Type
Civil HydraulicsLocation
Belconnen ACTClient
ACT Government & HindmarshDescription of work
Demolish existing carpark facilities; bulk excavation of new underground car parking, including construction of capping beams, bored piers; install drainage, plumbing & gas hydraulics as required.

Kinloch Terraces
Work Type
Civil HydraulicsLocation
Bruce ACTClient
Doma GroupDescription of work
This project consisted of 56 townhouses with 18 unit apartment complex. Bulk excavation, detail excavation, road works, external services abd design & construction of hydraulics package.